Partner

RRDM
Risk Register Design and Management
Design it, score it, actually use it

Rating:
0.0
English
Advanced
Video preview
Face to Face
Instructor-Led Training
(ILT-F2F)
Virtual
Instructor-Led Training
(ILT-V)
COACHING
& MENTORING
(C&M)
Self-Paced
Learning
(SPL)
Select Date
Download Brochure

Course Overview

Risk Register Design and Management tackles the most common failure of risk registers: they get built once, populated with good intentions, and then quietly abandoned. This course teaches risk identification, scoring, and register structuring designed for genuine ongoing use, with both an enterprise and GRC case track and a project case track so delegates work in the flavor most relevant to their

Key Takeaways

1
Build a risk register structured for genuine ongoing use, not a one-time exercise
2
Score risks consistently using a defensible methodology
3
Identify risks systematically in either an enterprise/GRC or project context
4
Maintain a risk register so it stays current as conditions change
5
Apply the register-building process directly to your own real risk landscape

Certifications

LEORON - Professional Development Institute
Brand Logo
LEORON Institute is the leading corporate training and EdTech company in the EMEA region, with the most comprehensive learning and development solutions in all strategic corporate functions, including Corporate Finance, HR, Procurement and SCM, Technology, Quality, Operations and Engineering. Through instructor-led sessions, in-company training, and coaching, our faculty of experts deliver over 2,000+ programs annually, while 50,000+ learners are equipped with up-to-date relevant education and the latest tech solutions across the EMEA region.

As a NASBA-registered CPE sponsor with a KHDA educational services permit in Dubai, LEORON also offers selected professional certifications eligible for HRDF reimbursement in Saudi Arabia.

Course Outline

1. Why most risk registers stop being used after the first month
2. Risk identification techniques for enterprise and project contexts
3. Scoring risk consistently and defensibly
4. Structuring a register for ongoing maintenance, not one-time creation
5. Building a live register from a messy set of inputs, matched to your track

Who Should Attend?

This course is designed for risk, GRC, compliance, and project professionals who need a risk register that stays useful well beyond its initial creation. It suits anyone who has built a risk register in the past only to watch it fall out of use within a few months.

FAQ

What is the difference between the enterprise and project tracks?

The enterprise/GRC track focuses on organization-wide risk registers, while the project track applies the same register-building skills to individual project risk management.

How does this connect to the Certified Enterprise Risk Specialist program?

This course introduces core register-building skills relevant to that broader four-to-five-day certification.

Is this delivered live online?

Yes, this course runs as Live Virtual Training with both case tracks available.

Reviews